Skip to content
EPCMap

EPC ratings in OX39, Chinnor

Postcode district in South Oxfordshire

Summary

Average rating

C70

South Oxfordshire average: D 68

Homes in OX39 have an average EPC rating of C (70), a little above the South Oxfordshire average of D (68).

OX39 has the 2nd highest average rating of the 8 postcode districts in South Oxfordshire. Flats and maisonettes rate best here, at C (78) on average; detached houses rate lowest, at C (69).

Rated D or worse
42%
South Oxfordshire: 47%
Typical yearly energy cost
£1,028
EPCs since 2021, at prices then
Built before 1930
9%

For landlords: 65% of privately rented homes here are below C (178 homes), the minimum from October 2030. See the 2030 rules

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the South Oxfordshire average.

  • Band A, score 92 to 100: <1% of homes; South Oxfordshire 1%.
  • Band B, score 81 to 91: 36% of homes; South Oxfordshire 23%.
  • Band C, score 69 to 80: 22% of homes; South Oxfordshire 29%.
  • Band D, score 55 to 68: 28% of homes; South Oxfordshire 32%.
  • Band E, score 39 to 54: 11% of homes; South Oxfordshire 12%.
  • Band F, score 21 to 38: 3% of homes; South Oxfordshire 3%.
  • Band G, score 1 to 20: <1% of homes; South Oxfordshire <1%.

Based on the latest energy performance certificate (EPC) for each of 2,612 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

Find the EPC for a home in OX39 → Search any address on the official EPC register on GOV.UK. Certificates are free to view and last 10 years. Need a new EPC in OX39? → You need one to sell or let a home. GOV.UK explains how to find an accredited assessor.

Postcode sectors in OX39

Smaller areas within OX39, each with its own page. They're also on the map.

Sectors with fewer than 30 homes on the EPC register aren't shown.

What homes here are like

What EPC assessors recorded when they visited homes in OX39.

Main heating

Gas boiler83%
Oil boiler9%
Electric storage heaters3%
Heat pump2%
Other electric heating2%

Walls, roof and windows

Solid walls, not insulated9%
Cavity walls, not insulated18%
Cavity walls, insulated35%
Solid walls, insulated1%
Other walls (timber, system-built or modern)37%
Loft insulation under 100 mm (homes with a loft)21%
Double or triple glazing throughout94%
Solar panels2%

Ratings by type of home

Flats usually rate higher than houses because they lose less heat through shared walls, floors and ceilings.

Type of homeShare of homesAverage ratingRated D or worse
Detached house32%C 69South Oxfordshire: D 6745%
Semi-detached house29%C 70South Oxfordshire: D 6741%
Terraced house20%C 71South Oxfordshire: C 6942%
Bungalow8%D 59South Oxfordshire: D 6280%
Flat or maisonette11%C 78South Oxfordshire: C 7314%

Typical floor area is the median. Types with fewer than 20 homes here aren't shown.

Privately rented homes and the 2030 standard

Landlords need an EPC rating of at least E to let a home today. From 1 October 2030, privately rented homes in England and Wales will need a C or better, unless the landlord registers an exemption.

65%

of privately rented homes here are below C (178 homes)

South Oxfordshire: 56%

  • 92% of those could reach C with the upgrades listed on their EPC.
  • 5% are rated F or G, below today's minimum of E (South Oxfordshire: 2%).

From homes whose latest EPC was for a private let. A home sold or let differently since may be counted in the wrong group. The 2030 standard will be measured with new EPC metrics, so treat these figures as a guide. Landlord guidance on GOV.UK

Upgrades recommended for homes in OX39

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 85% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 71% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 40% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 21% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 19% of EPCs here (England and Wales: 16%). 18% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Loft insulation top-up

    On 14% of EPCs here (England and Wales: 12%). 21% of homes with a loft have less than 100 mm of insulation.

    Typical cost: £100–£350

With all its recommended upgrades, 95% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £120 a year, at the prices used when each EPC was issued.

Map of OX39 and nearby areas

OX39's postcode sectors, and how it compares with the districts around it.

HP10, High Wycombe: D 67HP11, High Wycombe: C 71HP12, High Wycombe: D 66HP13, High Wycombe: D 68HP14, High Wycombe: D 64HP16, Great Missenden: D 62HP17, Aylesbury: C 70HP18, Aylesbury: C 70HP22, Aylesbury: C 71HP27, Princes Risborough: D 67OX10, Wallingford: C 69OX33, Oxford: D 64OX44, Oxford: D 65OX49, Watlington: D 63OX9, Thame: C 69RG9, Henley-on-Thames: D 63OX39 4: C 70OX39 4C 70OX39 4C 70
Colour shows each area's average rating. Tap an area to open it. A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 OX39 boundary Not enough EPCs

Bordering postcode districts

Common questions

What holds energy ratings back in OX39?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.