Skip to content
EPCMap

EPC ratings in M7, Salford

Postcode district in Salford

Summary

Average rating

C70

Salford average: C 72

Homes in M7 have an average EPC rating of C (70), a little below the Salford average of C (72).

M7 has the joint 4th lowest average rating of the 10 postcode districts in Salford.

Rated D or worse
33%
Salford: 31%
Typical yearly energy cost
£885
EPCs since 2021, at prices then
Built before 1930
21%

For landlords: 46% of privately rented homes here are below C (3,022 homes), the minimum from October 2030. See the 2030 rules

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Salford average.

  • Band A, score 92 to 100: <1% of homes; Salford <1%.
  • Band B, score 81 to 91: 10% of homes; Salford 24%.
  • Band C, score 69 to 80: 57% of homes; Salford 45%.
  • Band D, score 55 to 68: 23% of homes; Salford 24%.
  • Band E, score 39 to 54: 8% of homes; Salford 6%.
  • Band F, score 21 to 38: 1% of homes; Salford <1%.
  • Band G, score 1 to 20: <1% of homes; Salford <1%.

Based on the latest energy performance certificate (EPC) for each of 11,461 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

Find the EPC for a home in M7 → Search any address on the official EPC register on GOV.UK. Certificates are free to view and last 10 years. Need a new EPC in M7? → You need one to sell or let a home. GOV.UK explains how to find an accredited assessor.

Postcode sectors in M7

Smaller areas within M7, each with its own page. They're also on the map.

Sectors with fewer than 30 homes on the EPC register aren't shown.

What homes here are like

What EPC assessors recorded when they visited homes in M7.

Main heating

Gas boiler78%
Other electric heating11%
Communal or district heating5%
Electric storage heaters5%

Walls, roof and windows

Solid walls, not insulated14%
Cavity walls, not insulated16%
Cavity walls, insulated45%
Solid walls, insulated1%
Other walls (timber, system-built or modern)23%
Loft insulation under 100 mm (homes with a loft)26%
Double or triple glazing throughout93%

Ratings by type of home

Flats usually rate higher than houses because they lose less heat through shared walls, floors and ceilings.

Type of homeShare of homesAverage ratingRated D or worse
Detached house5%D 68Salford: C 7044%
Semi-detached house19%D 68Salford: D 6741%
Terraced house32%C 69Salford: C 6936%
Bungalow1%D 66Salford: D 6744%
Flat or maisonette42%C 71Salford: C 7624%

Typical floor area is the median. Types with fewer than 20 homes here aren't shown.

Privately rented homes and the 2030 standard

Landlords need an EPC rating of at least E to let a home today. From 1 October 2030, privately rented homes in England and Wales will need a C or better, unless the landlord registers an exemption.

46%

of privately rented homes here are below C (3,022 homes)

Salford: 37%

  • 89% of those could reach C with the upgrades listed on their EPC.
  • 1% are rated F or G, below today's minimum of E (Salford: <1%).

From homes whose latest EPC was for a private let. A home sold or let differently since may be counted in the wrong group. The 2030 standard will be measured with new EPC metrics, so treat these figures as a guide. Landlord guidance on GOV.UK

Upgrades recommended for homes in M7

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 55% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 43% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 40% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 19% of EPCs here (England and Wales: 24%). 14% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Cavity wall insulation

    On 17% of EPCs here (England and Wales: 16%). 16% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Heating controls

    On 13% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 96% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £105 a year, at the prices used when each EPC was issued.

Map of M7 and nearby areas

M7's postcode sectors, and how it compares with the districts around it.

M1, Manchester: C 76M11, Manchester: C 70M12, Manchester: C 70M13, Manchester: C 69M15, Manchester: C 77M16, Manchester: D 68M17, Manchester: B 83M18, Manchester: D 68M2, Manchester: C 70M24, Manchester: C 69M25, Manchester: D 65M26, Manchester: D 68M27, Manchester: D 67M3, Salford: C 78M30, Manchester: D 68M4, Manchester: C 78M40, Manchester: C 69M41, Manchester: D 64M45, Manchester: D 66M5, Salford: C 77M50, Salford: C 80M6, Salford: C 71M60: not enough EPCs to showM8, Manchester: D 67M9, Manchester: C 69M7 1: C 76M7 2: D 68M7 3: D 68M7 4: D 68M7 1C 76M7 2D 68M7 3D 68M7 4D 68M4C 78M6C 71M8D 67M7 1C 76M7 2D 68M7 3D 68M7 4D 68M3C 78M4C 78M6C 71M8D 67
Colour shows each area's average rating. Tap an area to open it. A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 M7 boundary Not enough EPCs

Bordering postcode districts

Common questions

What holds energy ratings back in M7?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.