Skip to content
EPCMap

EPC ratings in E18, London

Postcode district in Redbridge · EPC ratings across London

Summary

Average rating

D66

Redbridge average: D 66

Homes in E18 have an average EPC rating of D (66), about the same as the Redbridge average of D (66). 62% of homes here are flats or maisonettes, and 53% have solid walls with no insulation.

E18 has the joint 3rd highest average rating of the 8 postcode districts in Redbridge. Flats and maisonettes rate best here, at C (69) on average; semi-detached houses rate lowest, at D (57).

Rated D or worse
55%
Redbridge: 56%
Typical yearly energy cost
£880
EPCs since 2021, at prices then
Built before 1930
29%

For landlords: 45% of privately rented homes here are below C (2,240 homes), the minimum from October 2030. See the 2030 rules

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Redbridge average.

  • Band A, score 92 to 100: <1% of homes; Redbridge <1%.
  • Band B, score 81 to 91: 10% of homes; Redbridge 9%.
  • Band C, score 69 to 80: 35% of homes; Redbridge 35%.
  • Band D, score 55 to 68: 39% of homes; Redbridge 43%.
  • Band E, score 39 to 54: 14% of homes; Redbridge 12%.
  • Band F, score 21 to 38: 2% of homes; Redbridge 1%.
  • Band G, score 1 to 20: <1% of homes; Redbridge <1%.

Based on the latest energy performance certificate (EPC) for each of 6,599 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

Find the EPC for a home in E18 → Search any address on the official EPC register on GOV.UK. Certificates are free to view and last 10 years. Need a new EPC in E18? → You need one to sell or let a home. GOV.UK explains how to find an accredited assessor.

Postcode sectors in E18

Smaller areas within E18, each with its own page. They're also on the map.

Sectors with fewer than 30 homes on the EPC register aren't shown.

What homes here are like

What EPC assessors recorded when they visited homes in E18.

Main heating

Gas boiler84%
Other electric heating7%
Electric storage heaters5%
Communal or district heating2%
Oil boiler1%

Walls, roof and windows

Solid walls, not insulated53%
Cavity walls, not insulated12%
Cavity walls, insulated20%
Solid walls, insulated1%
Other walls (timber, system-built or modern)13%
Loft insulation under 100 mm (homes with a loft)45%
Double or triple glazing throughout85%

Ratings by type of home

Flats usually rate higher than houses because they lose less heat through shared walls, floors and ceilings.

Type of homeShare of homesAverage ratingRated D or worse
Detached house3%D 60Redbridge: D 6172%
Semi-detached house15%D 57Redbridge: D 5986%
Terraced house19%D 62Redbridge: D 6370%
Bungalow<1%D 56Redbridge: D 5884%
Flat or maisonette62%C 69Redbridge: C 7041%

Typical floor area is the median. Types with fewer than 20 homes here aren't shown.

Privately rented homes and the 2030 standard

Landlords need an EPC rating of at least E to let a home today. From 1 October 2030, privately rented homes in England and Wales will need a C or better, unless the landlord registers an exemption.

45%

of privately rented homes here are below C (2,240 homes)

Redbridge: 52%

  • 87% of those could reach C with the upgrades listed on their EPC.
  • &lt;1% are rated F or G, below today's minimum of E (Redbridge: <1%).

From homes whose latest EPC was for a private let. A home sold or let differently since may be counted in the wrong group. The 2030 standard will be measured with new EPC metrics, so treat these figures as a guide. Landlord guidance on GOV.UK

Upgrades recommended for homes in E18

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solid wall insulation (internal or external) More common here

    On 54% of EPCs here (England and Wales: 24%). 53% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Floor insulation

    On 39% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solar panels (PV)

    On 37% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 26% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 20% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 16% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 91% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £198 a year, at the prices used when each EPC was issued.

Map of E18 and nearby areas

E18's postcode sectors, and how it compares with the districts around it.

E10, Waltham Forest: D 68E11, Waltham Forest: D 65E17, Waltham Forest: C 69E4, Waltham Forest: D 66IG1, Ilford: D 67IG2, Ilford: D 66IG4, Ilford: D 63IG5, Ilford: D 64IG6, Ilford: D 67IG7, Chigwell: D 67IG8, Woodford Green: D 64IG9, Buckhurst Hill: D 65E18 1: D 64E18 2: D 67E18 1D 64E18 2D 67IG4D 63E18 1D 64E18 2D 67IG4D 63
Colour shows each area's average rating. Tap an area to open it. A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 E18 boundary Not enough EPCs

Bordering postcode districts

Common questions

What holds energy ratings back in E18?

About 53% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.