Skip to content
EPCMap

EPC ratings in PL1, Plymouth

Postcode district in Plymouth

Summary

Average rating

C70

Plymouth average: D 68

Homes in PL1 have an average EPC rating of C (70), a little above the Plymouth average of D (68). 78% of homes here are flats or maisonettes, and 31% have solid walls with no insulation.

PL1 has the joint highest average rating of the 8 postcode districts in Plymouth.

Rated D or worse
36%
Plymouth: 48%
Typical yearly energy cost
£745
EPCs since 2021, at prices then
Built before 1930
34%

For landlords: 44% of privately rented homes here are below C (4,014 homes), the minimum from October 2030. See the 2030 rules

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Plymouth average.

  • Band A, score 92 to 100: <1% of homes; Plymouth <1%.
  • Band B, score 81 to 91: 17% of homes; Plymouth 11%.
  • Band C, score 69 to 80: 47% of homes; Plymouth 40%.
  • Band D, score 55 to 68: 26% of homes; Plymouth 38%.
  • Band E, score 39 to 54: 8% of homes; Plymouth 9%.
  • Band F, score 21 to 38: 1% of homes; Plymouth 1%.
  • Band G, score 1 to 20: <1% of homes; Plymouth <1%.

Based on the latest energy performance certificate (EPC) for each of 13,435 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

Find the EPC for a home in PL1 → Search any address on the official EPC register on GOV.UK. Certificates are free to view and last 10 years. Need a new EPC in PL1? → You need one to sell or let a home. GOV.UK explains how to find an accredited assessor.

Postcode sectors in PL1

Smaller areas within PL1, each with its own page. They're also on the map.

Sectors with fewer than 30 homes on the EPC register aren't shown.

What homes here are like

What EPC assessors recorded when they visited homes in PL1.

Main heating

Gas boiler70%
Electric storage heaters10%
Communal or district heating10%
Other electric heating5%
Other or unrecorded2%
Oil boiler2%

Walls, roof and windows

Solid walls, not insulated31%
Cavity walls, not insulated9%
Cavity walls, insulated27%
Solid walls, insulated5%
Other walls (timber, system-built or modern)28%
Loft insulation under 100 mm (homes with a loft)30%
Double or triple glazing throughout85%

Ratings by type of home

Flats usually rate higher than houses because they lose less heat through shared walls, floors and ceilings.

Type of homeShare of homesAverage ratingRated D or worse
Detached house<1%D 59Plymouth: D 6768%
Semi-detached house1%D 65Plymouth: D 6652%
Terraced house19%D 68Plymouth: D 6744%
Bungalow<1%D 65Plymouth: D 6553%
Flat or maisonette79%C 71Plymouth: C 7033%

Typical floor area is the median. Types with fewer than 20 homes here aren't shown.

Privately rented homes and the 2030 standard

Landlords need an EPC rating of at least E to let a home today. From 1 October 2030, privately rented homes in England and Wales will need a C or better, unless the landlord registers an exemption.

44%

of privately rented homes here are below C (4,014 homes)

Plymouth: 48%

  • 88% of those could reach C with the upgrades listed on their EPC.
  • 1% are rated F or G, below today's minimum of E (Plymouth: <1%).

From homes whose latest EPC was for a private let. A home sold or let differently since may be counted in the wrong group. The 2030 standard will be measured with new EPC metrics, so treat these figures as a guide. Landlord guidance on GOV.UK

Upgrades recommended for homes in PL1

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Modern storage heaters More common here

    On 10% of EPCs here (England and Wales: 6%). 16% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • Solid wall insulation (internal or external)

    On 33% of EPCs here (England and Wales: 24%). 31% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Floor insulation

    On 22% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solar panels (PV)

    On 20% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 13% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Double glazing

    On 13% of EPCs here (England and Wales: 9%). 15% of homes aren't fully double or triple glazed.

    Typical cost: £3,300–£6,500

With all its recommended upgrades, 92% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £90 a year, at the prices used when each EPC was issued.

Map of PL1 and nearby areas

PL1's postcode sectors, and how it compares with the districts around it.

PL10, Torpoint: E 51PL11, Torpoint: D 62PL12, Saltash: D 64PL2, Plymouth: D 67PL3, Plymouth: D 65PL4, Plymouth: D 66PL5, Plymouth: D 68PL6, Plymouth: C 69PL9, Plymouth: C 70PL1 1: C 70PL1 2: D 68PL1 3: C 71PL1 4: C 74PL1 5: D 66PL1 1C 70PL1 2D 68PL1 3C 71PL1 4C 74PL1 5D 66PL1 1C 70PL1 2D 68PL1 3C 71PL1 4C 74PL1 5D 66
Colour shows each area's average rating. Tap an area to open it. A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 PL1 boundary Not enough EPCs

Bordering postcode districts

Common questions

What holds energy ratings back in PL1?

About 31% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. 34% were built before 1930. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.