Skip to content
EPCMap

EPC ratings in CV11, Nuneaton

Postcode district in Nuneaton and Bedworth · EPC ratings across Nuneaton

Summary

Average rating

C69

Nuneaton and Bedworth average: D 68

Homes in CV11 have an average EPC rating of C (69), about the same as the Nuneaton and Bedworth average of D (68).

CV11 has the highest average rating of the 3 postcode districts in Nuneaton and Bedworth.

Rated D or worse
50%
Nuneaton and Bedworth: 50%
Typical yearly energy cost
£857
EPCs since 2021, at prices then
Built before 1930
20%

For landlords: 60% of privately rented homes here are below C (2,231 homes), the minimum from October 2030. See the 2030 rules

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Nuneaton and Bedworth average.

  • Band A, score 92 to 100: 3% of homes; Nuneaton and Bedworth 2%.
  • Band B, score 81 to 91: 22% of homes; Nuneaton and Bedworth 18%.
  • Band C, score 69 to 80: 26% of homes; Nuneaton and Bedworth 30%.
  • Band D, score 55 to 68: 37% of homes; Nuneaton and Bedworth 38%.
  • Band E, score 39 to 54: 11% of homes; Nuneaton and Bedworth 11%.
  • Band F, score 21 to 38: 1% of homes; Nuneaton and Bedworth 1%.
  • Band G, score 1 to 20: <1% of homes; Nuneaton and Bedworth <1%.

Based on the latest energy performance certificate (EPC) for each of 15,214 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

Find the EPC for a home in CV11 → Search any address on the official EPC register on GOV.UK. Certificates are free to view and last 10 years. Need a new EPC in CV11? → You need one to sell or let a home. GOV.UK explains how to find an accredited assessor.

Postcode sectors in CV11

Smaller areas within CV11, each with its own page. They're also on the map.

Sectors with fewer than 30 homes on the EPC register aren't shown.

What homes here are like

What EPC assessors recorded when they visited homes in CV11.

Main heating

Gas boiler88%
Electric storage heaters5%
Other electric heating3%
Communal or district heating2%

Walls, roof and windows

Solid walls, not insulated24%
Cavity walls, not insulated6%
Cavity walls, insulated40%
Solid walls, insulated4%
Other walls (timber, system-built or modern)27%
Loft insulation under 100 mm (homes with a loft)20%
Double or triple glazing throughout95%

Ratings by type of home

Flats usually rate higher than houses because they lose less heat through shared walls, floors and ceilings.

Type of homeShare of homesAverage ratingRated D or worse
Detached house27%C 72Nuneaton and Bedworth: C 7147%
Semi-detached house22%C 69Nuneaton and Bedworth: D 6749%
Terraced house28%D 66Nuneaton and Bedworth: D 6658%
Bungalow5%D 62Nuneaton and Bedworth: D 6379%
Flat or maisonette18%C 70Nuneaton and Bedworth: C 7134%

Typical floor area is the median. Types with fewer than 20 homes here aren't shown.

Privately rented homes and the 2030 standard

Landlords need an EPC rating of at least E to let a home today. From 1 October 2030, privately rented homes in England and Wales will need a C or better, unless the landlord registers an exemption.

60%

of privately rented homes here are below C (2,231 homes)

Nuneaton and Bedworth: 57%

  • 95% of those could reach C with the upgrades listed on their EPC.
  • 1% are rated F or G, below today's minimum of E (Nuneaton and Bedworth: 1%).

From homes whose latest EPC was for a private let. A home sold or let differently since may be counted in the wrong group. The 2030 standard will be measured with new EPC metrics, so treat these figures as a guide. Landlord guidance on GOV.UK

Upgrades recommended for homes in CV11

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 75% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 65% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 49% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 25% of EPCs here (England and Wales: 24%). 24% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 22% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 17% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 95% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £88 a year, at the prices used when each EPC was issued.

Map of CV11 and nearby areas

CV11's postcode sectors, and how it compares with the districts around it.

B46, Birmingham: D 64B78, Tamworth: D 67CV10, Nuneaton: D 68CV12, Bedworth: D 67CV13, Nuneaton: D 67CV2, Coventry: D 67CV23, Rugby: C 72CV5, Coventry: D 64CV6, Coventry: D 66CV7, Coventry: D 68CV9, Atherstone: D 66LE10, Hinckley: D 68LE17, Lutterworth: D 66LE9, Leicester: D 68CV11 4: D 67CV11 5: D 64CV11 6: C 71CV11 7: B 86CV11 8: B 89CV11 4D 67CV11 6C 71CV12D 67LE10D 68CV11 4D 67CV11 5D 64CV11 6C 71CV12D 67LE10D 68
Colour shows each area's average rating. Tap an area to open it. A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 CV11 boundary Not enough EPCs

Bordering postcode districts

Common questions

What holds energy ratings back in CV11?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.