Skip to content
EPCMap

How energy efficient are homes in EC2A (London, Hackney)?

Summary

Average rating

C77

Hackney average: C 71

Homes in EC2A have an average EPC rating of C (77), well above the Hackney average of C (71). 99% of homes here are flats or maisonettes.

Rated D or worse
16%
Hackney: 34%
Typical yearly energy cost
£559
EPCs since 2021, at prices then
Built before 1930
24%

For landlords: 29% of privately rented homes here are below C (634 homes), the minimum from October 2030. See the 2030 rules

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Hackney average.

  • Band A, score 92 to 100: 0% of homes; Hackney <1%.
  • Band B, score 81 to 91: 54% of homes; Hackney 19%.
  • Band C, score 69 to 80: 30% of homes; Hackney 47%.
  • Band D, score 55 to 68: 12% of homes; Hackney 27%.
  • Band E, score 39 to 54: 3% of homes; Hackney 6%.
  • Band F, score 21 to 38: <1% of homes; Hackney <1%.
  • Band G, score 1 to 20: <1% of homes; Hackney <1%.

Based on the latest energy performance certificate (EPC) for each of 1,911 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

Postcode sectors in EC2A

Smaller areas within EC2A, each with its own page. They're also on the map.

Sectors with fewer than 30 homes on the EPC register aren't shown.

What homes here are like

What EPC assessors recorded when they visited homes in EC2A.

Main heating

Communal or district heating48%
Gas boiler38%
Other electric heating7%
Heat pump3%
Oil boiler2%
Electric storage heaters2%

Walls, roof and windows

Solid walls, not insulated28%
Cavity walls, not insulated2%
Cavity walls, insulated9%
Solid walls, insulated4%
Other walls (timber, system-built or modern)58%
Loft insulation under 100 mm (homes with a loft)62%
Double or triple glazing throughout84%

Ratings by type of home

Flats usually rate higher than houses because they lose less heat through shared walls, floors and ceilings.

Type of homeShare of homesAverage ratingRated D or worse
Terraced house1%D 66Hackney: D 6565%
Flat or maisonette99%C 77Hackney: C 7216%

Typical floor area is the median. Types with fewer than 20 homes here aren't shown.

Privately rented homes and the 2030 standard

Landlords need an EPC rating of at least E to let a home today. From 1 October 2030, privately rented homes in England and Wales will need a C or better, unless the landlord registers an exemption.

29%

of privately rented homes here are below C (634 homes)

Hackney: 36%

  • 86% of those could reach C with the upgrades listed on their EPC.
  • &lt;1% are rated F or G, below today's minimum of E (Hackney: <1%).

From homes whose latest EPC was for a private let. A home sold or let differently since may be counted in the wrong group. The 2030 standard will be measured with new EPC metrics, so treat these figures as a guide. Landlord guidance on GOV.UK

Upgrades recommended for homes in EC2A

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Double glazing More common here

    On 13% of EPCs here (England and Wales: 9%). 16% of homes aren't fully double or triple glazed.

    Typical cost: £3,300–£6,500
  • Solid wall insulation (internal or external)

    On 27% of EPCs here (England and Wales: 24%). 28% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Modern storage heaters

    On 7% of EPCs here (England and Wales: 6%). 9% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • New condensing boiler

    On 7% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 6% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450
  • Roof insulation (flat roof or room in roof)

    On 5% of EPCs here (England and Wales: 7%).

    Typical cost: £900–£1,500

With all its recommended upgrades, 96% of homes here could reach a C rating or better.

On EPCs issued since 2021, most homes here show little or no saving from their recommended upgrades, often because they're already efficient.

Map of EC2A and nearby areas

EC2A's postcode sectors, and how it compares with the districts around it.

E1, Tower Hamlets: C 73E1W, Tower Hamlets: C 73E2, Tower Hamlets: C 71E8, Hackney: C 71E9, Hackney: C 71EC1A, City of London: C 75EC1M, Islington: C 72EC1N, Camden: C 71EC1R, Islington: D 68EC1V, Islington: C 74EC1Y, Islington: C 72EC2M, City of London: D 61EC2N: not enough EPCs to showEC2R: not enough EPCs to showEC2V: not enough EPCs to showEC2Y, City of London: D 68EC3A, City of London: D 67EC3M: not enough EPCs to showEC3N, City of London: C 74EC3R, City of London: C 78EC3V: not enough EPCs to showEC4A, City of London: C 69EC4M, City of London: D 68EC4N: not enough EPCs to showEC4R, City of London: C 69EC4V, City of London: C 71EC4Y, City of London: D 66N1, Islington: C 71WC1N, Camden: D 67WC1R, Camden: D 68WC1X, Camden: C 72WC2A, Westminster: C 79WC2B, Westminster: C 70WC2R, Westminster: C 80EC2A 1: not enough EPCs to showEC2A 2: B 83EC2A 3: C 78EC2A 4: C 72EC2A 1EC2A 2B 83EC2A 3C 78EC2A 4C 72EC1YC 72EC2MD 61EC2YD 68EC2A 1EC2A 2B 83EC2A 3C 78EC2A 4C 72EC1YC 72EC2MD 61EC2YD 68
Colour shows each area's average rating. Tap an area to open it. A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 EC2A boundary Not enough EPCs

Bordering postcode districts

Common questions

What holds energy ratings back in EC2A?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.