Skip to content
EPCMap

EPC ratings in LL29, Colwyn Bay

Postcode district in Conwy · EPC ratings across Colwyn Bay

Summary

Average rating

D63

Conwy average: D 62

Homes in LL29 have an average EPC rating of D (63), about the same as the Conwy average of D (62). 41% of homes here were built before 1930, and 38% have solid walls with no insulation.

LL29 has the joint 3rd highest average rating of the 12 postcode districts in Conwy. Flats and maisonettes rate best here, at D (67) on average; semi-detached houses rate lowest, at D (59).

Rated D or worse
62%
Conwy: 64%
Typical yearly energy cost
£1,130
EPCs since 2021, at prices then
Built before 1930
41%

For landlords: 65% of privately rented homes here are below C (1,680 homes), the minimum from October 2030. See the 2030 rules

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Conwy average.

  • Band A, score 92 to 100: 1% of homes; Conwy <1%.
  • Band B, score 81 to 91: 8% of homes; Conwy 8%.
  • Band C, score 69 to 80: 29% of homes; Conwy 28%.
  • Band D, score 55 to 68: 40% of homes; Conwy 41%.
  • Band E, score 39 to 54: 17% of homes; Conwy 16%.
  • Band F, score 21 to 38: 4% of homes; Conwy 5%.
  • Band G, score 1 to 20: 1% of homes; Conwy 2%.

Based on the latest energy performance certificate (EPC) for each of 7,876 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

Find the EPC for a home in LL29 → Search any address on the official EPC register on GOV.UK. Certificates are free to view and last 10 years. Need a new EPC in LL29? → You need one to sell or let a home. GOV.UK explains how to find an accredited assessor.

Postcode sectors in LL29

Smaller areas within LL29, each with its own page. They're also on the map.

Sectors with fewer than 30 homes on the EPC register aren't shown.

What homes here are like

What EPC assessors recorded when they visited homes in LL29.

Main heating

Gas boiler79%
Electric storage heaters8%
Oil boiler7%
Other electric heating4%
Heat pump1%

Walls, roof and windows

Solid walls, not insulated38%
Cavity walls, not insulated13%
Cavity walls, insulated33%
Solid walls, insulated6%
Other walls (timber, system-built or modern)11%
Loft insulation under 100 mm (homes with a loft)24%
Double or triple glazing throughout86%
Solar panels1%

Ratings by type of home

Flats usually rate higher than houses because they lose less heat through shared walls, floors and ceilings.

Type of homeShare of homesAverage ratingRated D or worse
Detached house16%D 63Conwy: D 5959%
Semi-detached house24%D 59Conwy: D 6075%
Terraced house18%D 62Conwy: D 6266%
Bungalow8%D 59Conwy: D 6082%
Flat or maisonette34%D 67Conwy: D 6846%

Typical floor area is the median. Types with fewer than 20 homes here aren't shown.

Privately rented homes and the 2030 standard

Landlords need an EPC rating of at least E to let a home today. From 1 October 2030, privately rented homes in England and Wales will need a C or better, unless the landlord registers an exemption.

65%

of privately rented homes here are below C (1,680 homes)

Conwy: 67%

  • 92% of those could reach C with the upgrades listed on their EPC.
  • 3% are rated F or G, below today's minimum of E (Conwy: 4%).

From homes whose latest EPC was for a private let. A home sold or let differently since may be counted in the wrong group. The 2030 standard will be measured with new EPC metrics, so treat these figures as a guide. Landlord guidance on GOV.UK

Upgrades recommended for homes in LL29

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solid wall insulation (internal or external) More common here

    On 40% of EPCs here (England and Wales: 24%). 38% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Roof insulation (flat roof or room in roof) More common here

    On 11% of EPCs here (England and Wales: 7%).

    Typical cost: £900–£1,500
  • Solar panels (PV)

    On 59% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Floor insulation

    On 52% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solar water heating

    On 49% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 22% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 90% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £208 a year, at the prices used when each EPC was issued.

Map of LL29 and nearby areas

LL29's postcode sectors, and how it compares with the districts around it.

LL16, Denbigh: D 60LL22, Abergele: D 63LL26, Llanrwst: D 61LL28, Colwyn Bay: D 63LL30, Llandudno: D 64LL31, Llandudno Junction: D 66LL32, Conwy: D 59LL29 6: D 65LL29 7: D 64LL29 8: D 63LL29 9: D 62LL29 6D 65LL29 7D 64LL29 8D 63LL29 9D 62LL29 6D 65LL29 7D 64LL29 8D 63LL29 9D 62
Colour shows each area's average rating. Tap an area to open it. A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 LL29 boundary Not enough EPCs

Bordering postcode districts

Common questions

What holds energy ratings back in LL29?

About 38% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. 41% were built before 1930. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.